Home
Personal Introduction
Image Gallery
Videos from the field
Institutional Information
Ipev
Antarctica, the Treaty
Legal information
Contact
French Polar Institute headquarters
In Brest techno park
Antarctic administrative – claims
Antarctica Comnap Map
With stations positions
Antarctic Topography
L’astrolabe P&O
Berthed Hobart wharf
L’astrolabe P800 leaving Hobart
Satellite picture seaice extension
and ship track
L’astrolabe P800
Arriving at Dumont d’Urville
L’astrolabe P800 at seaice edge
L’astrolabe P800 berthed
along seaice edge
Unloading operations & Sea ice transfers
of the seaice edge
L’astrolabe P800
berthed along seaice edge
Astrolabe P&O in operations
Berthed along seaice edge
filling bladders
L’astrolabe P&O
Moored at edge of the sea ice
L’astrolabe P&O
Moored at edge of the sea ice
L’astrolabe P&O
Moored at edge of the sea ice
L’astrolabe P&O
Beached along seaice edge
Kassbohrer PB300 snow groomer
Test in combination with air-cushion sledges
Kassbohrer & navigation equipment
Sea ice transfers
Meeting the vessel at the sea ice edge
Transfers from the ship
Fuel Bladders on Sea Ice
Transfers from the ship
Filling fuel Bladders On Sea Ice
Transfers from the ship
Fuel Bladders on Sea Ice
Transfers on sea ice
Vehicles sleds and loads
Sea Ice Cracks & rivers
Unloading operations
Transfers on seaice – teams in convoys
Transfers on sea ice
Vehicles sleds and loads
Altitudes of the Antarctic continent
Elevation – Altimetry for the traverse route
Concordia traverses – Navigation software view
Satellite view of the track and crevasses
Surface of the Antarctic continent
Concordia traverses – Theory of the berm used to locate the track
Remaining visibility of the track between two convoys
Remaining visibility of the track between two summer seasons
Traverse – diagram
Typical Traverse Train assembly
Traverse Nr 59 -130 km off the coast
Traverse – full Convoy
Traverse – convoy on the move
bad weather situation
Challenger tractor fitted with 4 x 2000 W floodlights
Traverse – Challenger C65 Tractor
Previous model fitted
with 4 Philips Arena lights
Traverse – Challenger C65
Tractor previous model
Traverse – Challenger MT 865 Tractor
Traverse – Challenger MT 865 Tractor
Traverse – Grading machine prototype
Based on a Challenger C65 chassis
during construction
Traverse – Grading machine prototype
Based on a Challenger C65 chassis
Traverse – Grading machine prototype
Based on a Challenger C65 chassis
Traverse – Challenger tractor
Fitted with navigation equipment
Traverse – Prototype
Based on a Challenger C65 chassis
Fitted with Navigation
Concordia traverses – view of the track lit by floodlights
Traverse – Riding in whiteout
And / or bad weather using powerfull
headlights
Traverse – bad weather situation
Traverse – Challenger C65
Riding in bad weather using headlights
Traverse – Bad weather situation
Traverse – Bad weather situation
Traverse – Snow groomer
Kassbohrer Pisten Bully
Traverse – Snow groomer
Kassbohrer Pisten Bully
Visualisation of a 12-berth
caravan design
Traverse – project energy / power van
Traverse – 3D illustration
Life caravan view (without roof)
Traverse – Ipev made caravan set
(living & power)
Traverse – Lamberet caravan set
(living & power) – Rear view
Traverse – Lamberet caravan set
(living & power) – Front view
Traverse – Ipev made caravan set
Living – internal layout
Traverse – Ipev made caravan set
Living – internal layout
Traverse – Air cushion sled loaded
(Pronal bladders)
Traverse – Air cushion sled empty
Traverse – view 32m3
Fuel sled tanker
Traverse – 3D illustration
26m3 Sled tanker
Traverse – view
26m3 fuel sled tanker
Traverse – 3D illustration
12m3 fuel sled tanker
Traverse – View 12m3 fuel sled tanker
Traverse – view
6m (1 x 20′) cargo with deck
Traverse – 3D illustration
6m (1 x 20′) cargo with deck
Traverse – view 40′ cargo
sled (trailer style) loaded
Traverse – view 6m
(1 x 20′) cargo without deck
Traverse – 3D illustration
40′ cargo sled (trailer style)
Sled for 2 x 40 feet
Combination of mattress
sled and front dolly with skis
Illustration Sled 2 x 40 feet
Combination of mattress sled
and front dolly with skis
Concordia main buildings
Original Draft
Concordia station main buildings
3D illustration
Concordia Construction
steel frameworks
Concordia Construction
Steel frameworks
Concordia Construction
Completion of the steel frameworks
Concordia construction
Internal layout
Station Concordia completed
Outside view – Noisy building
Station Concordia at Dome C
Completed – outside view
Concordia at Dome C completed
In operation
Concordia at Dome C completed
in operation
Concordia Station
Interior view of the telecommunications room
Concordia Station
Interior view of the cafeteria
Concordia Power station
Housing units assy top View / layout
Concordia power station
Sketch of the units of the station building
Concordia – Sketch
Power station
Heating cooling networks
Concordia Power Station
Reassembly on site
Concordia power station
Cogeneration heating cooling exchangers
Concordia power station
Cogeneration heating cooling exchangers
Concordia Boilers Room
Illustration – Concordia fallback camp
Power and sanitary facilities
Dumont d’Urville vincinity
Quiet seaice
Antarctica coastal area
Antarctica coastal area
Antarctica coastal area
Antarctica – The white continent
Dumont d’Urville – Ile des Pétrels
Dumont d’Urville
Aerial view of the station
Dumont d’Urville – Ile des Pétrels
Dumont d’Urville
Main area of the station
view of the ship in operation
Dumont d’Urville – Bt 31
Communal living area
Dumont d’Urville
Recent Construction
Awaca – Field units waiting for shipment to the icecap
Dumont d’Urville
Laboratory Renovation
Dumont d’Urville
Laboratory Renovation
Dumont d’Urville
Ropatec Wind turbine 20 kW
Vertical Axis
Dumont d’Urville
Ropatec Wind turbine
20 kW Vertical Axis
Challenger stacked over seaice
Accident over seaice with Challenger 5
Secured with pontoon sections
View from underwater
situation end of the winter
Lifting operation
End of the recovery operation
Going home for repairs
Awaca Stations 6m instrumentation units
and 3m power units on site
Awaca stations
3m Energy equipment Unit
Awaca stations
Assembly of 6m+3m units on sled
“]